SETTING OUT OF HD BOLTS AT TOP OF THE ROOF IN CENTRAL LONDON
TIMBER FRAME BUILDING
RECONSTRUCTION OF RIVER BANK EAST LONDON. WORKING WITH CONSTRUCTEX AND SHEET PILING UK
STAIRCASE SITE SURVEY AND CAD DRAWINGS FOR ONE OF MY LONG-LASTING CLIENT
RESTORATION OF THE BRITISH LOST HERITAGE

This is one of the most interesting works I have recently been involved in. Working for Bow Tie Construction Ltd, I set out new foundations. The job is the first stage of the restoration of the heritage building. It is hard to believe but the building was stripped down by its new owner at the beginning of the 20th century.



